The project is located in Ya'an City, Sichuan Province. The name of the project is Kerui Building Materials 500-600 ton/hour aggregate production line project. The project is constructed by Sichuan Xinyida Machinery Co., Ltd. in EPC cooperation mode. The raw material of the project is river pebbles, and the production process of 4-stage crushing, three-stage screening and water washing is adopted
Back to top